Northern Regional Load Despatch Centre
POSOCO Ltd LOGO POSOCO LOGO
POSOCO
POSOCO Intranet E-Mail Hindi
POSOCO ISO 9001 Certified. ISO 1001 Certified OHSAS 18001 Certifiied ISO 27001 Certified
POSOCO
Skip Navigation Links
Home
Transfer capabilityExpand Transfer capability
SchedulingExpand Scheduling
Open Access
CommercialExpand Commercial
Availability Verification
ReportsExpand Reports
Documents
WeatherExpand Weather
Disaster Management
RE Initiative
Tenders
Calculations...
SEM Hand book
 


Net injection of Inter State Generating stations (ISGS)/BBMB generating stations & net drawal of State Utilities using Special Energy Meters (SEMs)

(i)            The sign convention of power flow recorded by meters is positive for flow out of bus-bar and negative for power flow into the bus-bar. However, for meters on LV/HV side of Generator Transformers, the meters have actually been connected so as to read positive for power flow into the HV bus-bar.

(ii)          Net injection/drawal at any location is algebraic sum of meters (including sign) on all feeders/ICTs/GTs listed with that location.

(iii)         Net drawal of State Utilities would be algebraic sum of drawals at all the locations listed for that utility.

(iv)        Multiplying factor to be applied with standby meters is to compensate for transmission/transformation losses & would depend upon voltage level (1.5 % for 400 kV, 3% for 220 kV lines & 4% for 132 & below lines) as agreed by Commercial Committee of NREB in its 105th meeting held on 08.03.2001. 

(v)          State Utilities would also be required to send daily readings of the Existing Conventional Meter (ECM) along with time of outages of some LV feeders listed with respective states to NRLDC on a weekly basis. (SEMs on these feeder have not been installed in view of negligible/ constant power flows).



Site Meter Reliability, Security and Economy in Power Transmission (Best viewed with 1280 by 800 Screen Resolution) Website Monitoring