Northern Regional Load Despatch Centre
POSOCO Ltd LOGO POSOCO LOGO
POSOCO
POSOCO Intranet E-Mail Hindi
POSOCO ISO 9001 Certified. ISO 1001 Certified OHSAS 18001 Certifiied ISO 27001 Certified
POSOCO
Skip Navigation Links
Home
Transfer capabilityExpand Transfer capability
SchedulingExpand Scheduling
Open Access
CommercialExpand Commercial
Availability Verification
ReportsExpand Reports
Documents
WeatherExpand Weather
Disaster Management
RE Initiative
Tenders
Documents...

Papers

Challanges Faced and Lesson Learnt in Implementation of First Synchrophasors Project in Northern India
HOW FOG MONITORING AND FORECSTING CAN HELP POWERSYSTEM
Experience of commissioning of PMUs Pilot Project in The Northern Region of India NPSC 2010
Operational Experience of Synchrophasor Pilot Project CBIP Conference 5 PA
Mock Black start Excellent Learning Experience CBIP Conference 5 PA
Reactive Power and system frequency relationship : A case study.
Power Exchange Implementation in India
Empowering India through Integrated Grid Operation
Application of phase angle measurment - CIGRE-2008
Transparency In Power System Operation
Relevance of Knowledge Management in Control Centres
A Novel Settlement / Arbitrage Scheme - Use Of Asynchronous Inter-Regional Links In India
Facilitating Open Access Without Compromising Grid Security
Visualization And Human Factors In Electric Power System Operation
Significance Of UI Mechanism In Indian Electric Supply Industry
Frequency Response Characterstics of An Interconnected Power System - A Case Study of Regional Grids in India
Advance Concept of Automation in Energy Control Centres
Paper on Protection System Performance
Deployment of SPS in Northern Region Dec 2011
Smart Grid initiative at Super Grid Level In India Hyderabad
A Near Miss - 2009/11/28 at 1326hrs

Articles

Blackout Watch - Indian Blackout 2010
Efficient Data Management - IT-power synergy to improve efficienecy
A Tribute To Power Systems Guru - Charles Concordia
ABC Of ABT - A Primer on Availability Tariff
A Poetry On UI
A Story In Quotes
GridMgmt Overview Nov2007 Electrical India
Realising A Collective Vision Through Non Cooperation
SCADA in Indian Power System
Renewable Energy and Renewable Energy Certificates Indian Context
Book Review

Statutory Documents

Indian Electricity Grid Code (IEGC)
Indian Electricity Grid Code (IEGC) First Amendment
Indian Electricity Grid Code (IEGC) Second Amendment
Operating Procedures of Northern Grid 2014-15
Important Grid Element in Northern Region:2014-15

CERC related docs

Revised Congestion Management Procedure in Real-Time System Operation
Format affidavits on " No Objection or Prior Standing Clearance" for Bilateral transactions(except for Intra-day/contingency transaction)
Format affidavits on " No Objection or Prior Standing Clearance" for Collective transactions for day ahead and intra-day/Contingency Bilateral transactions
" No Objection or Prior Standing Clearance" letter from Secretary, CERC

Other Documents

Report of the Committee on Manpower Certification and incentives
Procedure For Bilateral Transactions
Grid Disturbance on 12.10.2007
Draft Report on Rate of Change of Frequency (df/dt)
Approach Paper for Assessment of Transfer Capability in the Indian Bulk Electric Power
Grid Disturbance Report of 2nd Jan 2010
Synchrophasors Initiative in India June 2012
MoM of Winter Preparedness meeting on 19th Nov 2012 at NRLDC

Site Meter Reliability, Security and Economy in Power Transmission (Best viewed with 1280 by 800 Screen Resolution) Website Monitoring